Given the increase in the clean energy production, PYPSA a parent company of TEC, has invested in the creation of an experienced group to develop renewable energy projects, design, management, and site supervision for renewable resource projects such as wind, solar, photovoltaic, and biomass energy.
Management and supervision of the Valley Protection Program construction in Peru. Funded by the Japanese International Cooperation Agency (JICA).
The project consists of two dams, two spillways, a sand trap, a discharge pipe, and a conduction tunnel, the height of the main dam is 53.5 meters.
GENERAL INFORMATION
Location:Peru
Date: 2020
Management and supervision of the contract to Coca Codo Sinclair for the engineering development, equipment and material supply, construction of civil works, assembly of equipment and start-up of the Coca Codo Sinclair Hydroelectric project.
The project consists of two dams, two spillways, a sand trap, a discharge pipe, and a conduction tunnel, the height of the main dam is 53.5 meters.
GENERAL INFORMATION
Location: Republic of Ecuador
Date: 2011 – 2018
Legal and technical assistance provided to the Comision Federal de Electricidad to follow up the demands and claims, as well as the administration of the diverse public work contracts associated with the construction of La Yesca Hydroelectric project.
The project consists of two dams, two spillways, a sand trap, a discharge pipe, and a conduction tunnel, the height of the main dam is 53.5 meters.
GENERAL INFORMATION
Location:Tepic, Nayarit, Mexico
Date: 2011 – 2012
Supervision of the civil works associated to the construction of the Hydroelectric project El Cajon in Nayarit delivered to the Comision Federal de Electricidad.
Concrete face dam with a height of 194m.
Control structure with six radial gates supported by a concrete spillway that discharges into two covered channels. Maximum design rate of 15,915 m3 per second.
Intake work located on the right side, it communicates with an underground powerhouse with an installed capacity of 750 MW, two turbines Francis type of 375 MW capacity each. Plant connected to the national energy system with an annual production of 1,229 gwh.
GENERAL INFORMATION
Location: Tepic, Nayarit, Mexico
Date: 2003 – 2007
Supervision and quality control of the Luis Donaldo Colosio Murrieta Hydroelectric project (Huites), in the state of Sinaloa.
Storage capacity of 4,568 million m³ to irrigate 446,000 hectares of crops using the river flow rate of the Rio Fuerte.
Concrete dam gravity-type with 166 m of high and 426 m long, with outlets and spillways, the latter with four radial gates on the spillway crest connected to the discharge channel. Spillway's design rate of 22,445 m³ per second.
Intake work and hydroelectric plant located on the right side of the dam. Hydroelectric plant with an installed capacity of 400 MW, two turbines Francis type of 200 MW each. Plant connected to the national energy system, eastern sector, with an annual electric production of 875 GHW.
GENERAL INFORMATION
Location: Sinaloa, Mexico
Date: 1992 – 1996